Deliberation of the French Energy Regulatory Commission of 30 January 2024 on the decision on the tariff for the use of the underground natural gas storage infrastructures of Storengy, Teréga and Géométhane (ATS3)
Deliberation of the French Energy Regulatory Commission of 30 January 2024 on the decision on the tariff for the use of the natural gas transmission networks of GRTgaz and Teréga (ATRT8)
Deliberation of the Commission de régulation de l’énergie of 30 March 2023 deciding on the implementation of provisions of Article 14 of Council Regulation (EU) 2022/2576 of 19 December 2022
Deliberation by the Energy Regulatory Commission of 24 November 2022 giving an opinion on the exemption request by the company Total Energies LNG Services France for the floating LNG terminal in Le Havre
Deliberation by the French Energy Regulatory Commission of 3 November 2022 adopting the decision reviewing the joint decision on cross-border allocation for the Celtic Interconnector project
Deliberation of 7 October 2022 deciding on the creation in the gas transmission tariff of a term applicable to the physical exit capacity at the Obergailbach interconnection point
Deliberation of 29 September 2022 forming a draft decision on the creation in the gas transmission tariff of a term applicable to the physical exit capacity at the Obergailbach interconnection point
Deliberation of the French Energy Regulatory Commission of 17 March 2022 on the request for revision of the decision to exempt Dunkerque LNG from regulated third-party access
Deliberation of the French Energy Regulatory Commission of 19 January 2022 deciding on the investment request submitted by GridLink Interconnector Limited